Deltek Acumen 8.8 – Download

Explanation

Improving schedule quality and risk management helps deliver projects on schedule and on budget. Monte Carlo simulation can identify and help reduce schedule and cost risks and improve outcomes. With Deltek Acumen, you can adjust risk schedules to shape impact, collectively reduce exposure and improve completion confidence. Acumen 360 helps create a reliable schedule to identify opportunities for acceleration and help choose the best way to optimize project completion. Risk Acumen helps determine the impact of schedule delays on project cost estimates by aligning schedule and cost risk correlations. Risk Acumen uses qualitative risk analysis to identify risks and help evaluate mitigation plans to determine the ROI of each step. Acumen 360 identifies project acceleration opportunities to help make smart decisions on the best path

Deltek Acumen Guide

  • It supports qualitative risk analysis with uncertainty, risks, mitigation or any combination to compare results.
  • Deltek Acumen easily links schedule risk and cost risk to determine the impact of schedule delays on project cost estimates.
  • Leverage project risk management to create customized schedule charts and export them back to your scheduling tool.
  • It includes actionable information in easy-to-understand reports that can be run at any stage of the project
  • Examples include: Unexpected Risk Exposure, Risk Drivers of activities or events, Potential Risk Path Report, Risk Sensitivity (JCL) and executive summary reports.
  • Downsizing can be simple or include multiple steps in a downsizing plan
  • Mitigation analysis looks at each step of the plan and identifies the savings impact step by step to make better decisions.
  • Use Risk Drivers to identify risks to mitigate and mitigation analysis to determine the most effective measures.
  • Take advantage of the powerful acceleration engine to create scenarios and compare results to keep projects moving forward.
  • Determining the duration by interactively accelerating tasks, task groups or the entire project schedule, in real time.
  • Complete modifications, including acceleration levels and compression system
  • Automation makes the task of speeding up the schedule difficult and time-consuming.
  • Create multiple calendars to weigh different options and choose the best one

System Requirements

No database installation required

The least

  • Operating System:Windows 32-bit
  • PROCESSOR: 2 Saddle
  • Storage: 300 MB Hard Drive Space
  • Note: 3 GB RAM (32-bit)
  • Photos: N/A

recommended

  • Operating System:Windows 64-bit
  • PROCESSOR: 4 Saddle
  • Storage: 500 MB Hard Drive Space
  • Note: 8 GB RAM (32-bit)
  • Photos: Discrete GPU recommended. An older integrated GPU will affect performance

pictures

Deltek Acumen screen

buy it

Any questions Contact us

size

353 MB

free download software latest version